September 24, 2025

Looking Back: How John Sutch Cranes Helped Build a Regional Landmark

Nine Months, 24/7 Operations, Zero Incidents – The Mersey Gateway Success Story

Seven years after opening, the Mersey Gateway Bridge stands as testament to British engineering excellence and the crucial role John Sutch Cranes played in transforming vision into reality.

When the £600 million bridge opened in October 2017, it marked completion of one of the UK's most ambitious infrastructure projects. Behind the headlines lay thousands of hours of meticulous planning and flawless execution from the lifting operations that made it all possible.

For John Sutch Cranes, the 2.3-kilometre crossing represented a defining moment showcasing our capability to support nationally significant infrastructure at the highest level.

The Scale of Achievement

The numbers tell a remarkable story. John Sutch Cranes deployed a significant portion of our fleet for nine consecutive months, maintaining 24/7 operations to support the ambitious construction timeline. From smaller mobile units to heavy lifting specialists managing the bridge's distinctive cable-stayed design, every crane played a vital role.

Operating over the Mersey's challenging environment demanded precision engineering. Stringent safety protocols, coordination with multiple contractors, and adapting to changing conditions all required exceptional operational excellence.

The results speak volumes: zero accidents throughout nine months of intensive operations, every critical lift completed on time, and efficient resource allocation that supported the project's successful delivery exactly as scheduled.

Legacy and Recognition

As John Sutch reflected: "This project represents everything our company stands for – technical excellence, unwavering commitment to safety, and the ability to deliver on major infrastructure projects."

Today, the bridge continues transforming regional connectivity, reducing journey times and supporting economic growth. For John Sutch Cranes, it established a new benchmark for complex infrastructure involvement and positioned us as the trusted partner for nationally significant projects.

The Mersey Gateway will serve generations – proof of what exceptional capability can achieve on extraordinary projects.

Check out the full case study here > > >https://www.johnsutchcranes.co.uk/casestudies/the-mersey-gateway-bridge-runcorn

Liverpool
Bridle Park,
Bridle Road,
Bootle,
Merseyside
L30 4UG
CallEmail
Manchester
Rothesay Garage,
Globe Lane Industrial Estate,
Broadway,
Dukinfield,
SK16 4UU
CallEmail
©
John Sutch Cranes. All Rights Reserved.  Site designed by doodledo
This website uses cookies. View our Privacy Policy for more information on their use and opt-in or out as suits your preferences.